...
Gate Entry Process
A gate entry can be generated following the existing process with modifications in certain steps like Box ID printing will not be required.Inward Staging Putaway(Box Putaway or Pallet Putaway)
Inward staging area serves as an organized holding space for incoming boxes. It is a designated space within a warehouse where inward boxes after receiving are temporarily stored for the GRN process or Sample QC(sample QC is required for Box-wise Inwards or Box-wise Crossdock based on defined Inspection percentages).
Sample QC Workflow
Implemented a dynamic sampling QC process, empowering operators to perform cycle counts and QC on a sample of boxes per supplier.It Ensures the quality of received items with options for QC pass, QC fail, or Extra items.
The implementation of a Sample QC workflow is crucial for ensuring the quality and precision of items received in boxes, especially with box-wise inward flow.
Setting a specified percentage for sample QC at the supplier level is essential to validate the accuracy of Box and Item mapping. Achieving the designated percentage result is necessary for subsequent processes like Gate entry approval, stringent inventory control, and efficient warehouse operations.
Additionally, clients have the flexibility to skip sample QC for trusted suppliers, enhancing operational efficiency while maintaining rigorous quality control when needed.
Sample QC consists of below 2 processes:
...