Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

High Level Steps

  1. Configure minimum required inspection percentages QC % on a supplier level. This is used determine the minimum number of boxes for which inspection will become mandatory.

  2. Inward staging, putaway boxes to inward staging and Inspection picking from inward staging. Optional to keep boxes in staging while sample QC is in progress.

  3. Box inspection Inspect boxes one by one and find discrepancies or QC fail items.

  4. Gate Entry Approval Supervisors to check the result of sample QC and approve for GRN.