Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The sales between this date range is are used to create the process buckets according to their revenue contribution.

...

The number of buckets given is used to split the revenue contribution across each bucket in a category. If the buckets bucket's required input is 4, that means the contribution benchmark to be taken for each bucket will be 1/4 = 25%.

...

This range is used to split the MRP’s MRPs between the minimum and maximum MRP for a category. If the first bucket range is giving more revenue contribution than the calculated contribution through buckets required calculation, then the second bucket range is used and similarly the third one.

For eg: First If the first bucket range is 1000, then the buckets will be created in the following manner: 0-1000, 1000-2000, 2000-3000 and so on considering 0 is the min MRP in that category.

...